About us

MIJA Construction Services is a joint-venture between G1 Construction Inc. and Lead Builders Inc. Our combined, vast experience includes all aspects of general contracting for design-build and design-bid-build projects, along with technical trade specialties such as electrical, telecommunication system repair and component modernization. We produce vertical and horizontal construction projects on time to meet or exceed federal project objectives.

Services

Design-Build


Design-Bid-Build


MEP In-House


Framing


Demolition


Drywall


Project Management


Quality Control


Site Safety

Projects

Edwards AFB

Global Vigilance Hangar

$7,890,000.00 Prime

  • Demolish entire interior building systems, walls, fire rated doors, cabinetry, tile, plumbing, HVAC & mechanical, electrical distribution, roofing. Install roof, fire suppression & high expansion foam system, electrical distribution, partition walls, doors, fire-rated exit doors/frames, bathroom partitions/fixtures, tile, cabinetry, Radiant Heating & Fire Alarm Systems, mass notification system.

MICC-Fort McCoy

Install Outside Air Units

$880,719.00 Prime

  • This project consisted furnishing and installing 3 dedicated outdoor air units, roof replacement and patching. Furnished & installed control systems.


US Army

Renovate B.701/704

$1,287,459.00 Prime

  • This project consisted of providing demolition of walls, sinks, doors and doorways, lighting, HVAC ducts and diffusers; installation of new walls, interior and exterior painting of both buildings, flooring materials, VCT, carpet tiles, ceilings, painting, installation of various equipment and plumbing fixtures, lighting, HVAC diffusers/grilles, piping insulation, ductwork, and communications line, HVAC design, electrical, mechanical, plumbing, roof replacement, and build-out of new offices in an existing warehouses for the US Army Reserve.

Newbury Park

Fire Station No.35

$5,350,001.00 Prime

  • Construction of 12,000 SF fire station. Excavation, grading for high-strength concrete. Underground utilities: plumbing, sanitary sewer, storm drain, electrical including emergency generator and ATS backup systems/communications. Structural steel construction for living quarters/roof. Install new windows, casework cabinets, fire suppression system, fiber optic, CAT6 communication systems, partition walls, new painting, doors, 6 overhead roll-up doors, HVAC & Mechanical systems. Radiant heating system and exhaust fume system in apparatus bay. Install Fire Alarm system, mass notification systems, public address system.

Snapshot of More Past Performance:

Fort Irwin

Repair Barracks Bldg. 251

$7,890,000.00 Prime

  • Demolish entire failing interior building systems & deteriorated infrastructure. Install electrical systems/distribution, fire suppression system, walls, interior doors/access systems, fire rated exit doors/frames, bathroom/break area plumbing, painting, partitions, fixtures, cabinetry. HVAC & Mechanical systemon three floors. Install walls, epoxy flooring in all rooms, kitchen & bedroom room cabinetry. Install fire alarm system, mass notification system and new lighting.


Air Force

B2500 Phased Renovation

$11,513,799.00 Prime


USACE

Abiquiu Dam Septic System Replacement

$95,000.00 Prime


SIAD

304 Rehab.

$4,026,777.95 Prime


USACE

Santa Barbara Flood Basin Debris Removal

$3,994,478.00 Prime


USACE

FIBER IDIQ

$4,000,000.00 Prime


NPS

Woolsey Fire Debris Clean-up

$1,808,015.00 Prime

Our clients